Technical system copy for the upgrade
Hybrid: for example, the source systems on-premises and the target systems on cloud
Strategy as of NetWeaver 2007: Prerequisite: in the case of a Unicode conversion, conversion must be performed during export. If the target database can be built with unsorted unloaded data, all packages are automatically unloaded unsorted. R3load ensures that tables that must always be unloaded sorted are unloaded sorted.

Over 30 productive systems at more than 9 customers successfully copied using IMIG. For the Unicode conversion of a 4.5 TB system (2.7 TB data) a downtime of 16 hours was achieved (including the follow-up work such as reconfiguration, updating DB statistics, generating reports, creating backups, testing the system).
Efficient options for SAP system copies
In the case of BSC, sophisticated mechanisms make it possible to exclude configuration errors, since relevant parameter settings are made automatically and according to predefined rules. For example, it is automatically recognized whether the system is an Abap, Java or double-stack system.

To ensure that SAP solutions are nevertheless used optimally, decision-makers are well advised to regularly subject IT landscapes and applications to intensive testing. This helps to avoid potential errors and risks during operation, which can quickly lead to immense costs. But providing test data can also prove to be a challenge. Given the increased use of Big Data, storage space and resulting costs are constantly rising. In addition, testing is complicated by the growing complexity of applications and IT architecture. It can therefore be profitable for companies to invest in professional test data management, which offers decisive advantages.

With "Shortcut for SAP Systems", tasks in the area of SAP system copy are simplified and made possible.

When you install the Connector for LaMa, the following SAP Landscape Management operations are enabled in Google Cloud.

This can usually be accomplished by passing a system copy of the production system, created for updates, to the QA system.